Renovation Guide · Bathroom

HDB Bathroom Renovation & Waterproofing (2026)

Published 25 June 2026·Updated 23 July 2026
Renovated HDB bathroom

Bathrooms are small but among the most technical rooms to renovate — waterproofing, tiling and plumbing all have to be right, because mistakes here are expensive to fix later. Here's what an HDB bathroom renovation involves in 2026.

What's involved

HDB bathroom tiling and waterproofing
Waterproofing sits beneath the tiles — invisible when done right, costly when skipped.

What drives bathroom cost

What pushes bathroom cost up
Full hack vs. overlaylargest factor
Tile choice & areahigh
Waterproofing systemmedium-high
Fittings & sanitarywaremedium
Plumbing relocationsmedium
Never skip or cut corners on waterproofing. It's a small fraction of the cost but the single biggest cause of leaks, disputes with neighbours, and re-do bills. Always confirm it's in the quote.
Overlay or full hack?

Overlaying new tiles over old saves time and cost but adds height and isn't always suitable. A full hack lets us re-waterproof properly — we advise per case.

How long does a bathroom take?

Typically 1–2 weeks including waterproofing cure time, sequenced with other wet works.

Do you handle the plumbing and electrical?

Yes — one team handles tiling, waterproofing, plumbing and electrical for the bathroom.

See our services or the HDB renovation cost guide.

The direct-contractor advantage: we're the renovation contractor, not a middleman — our own team does the work, so you're not paying a designer's markup on labour. More of your budget goes into materials and finishes.